INSTALLATION PROCESS
1. Draw the frame line of the A grade fire-proof board on the wall space according to the layout diagram of the metope and the actual conditions.
2. Pre-assemble the longitudinal and horizontal beams on the ground according to the layout digram, with each assembled unit not exceeding 6m and the interval between beams being 300 to 400mm in general.
3. Formally install beams on the wall space by using expansion bolts and metal corner connectors. Use L-shape aluminum alloy connections to fix at the intersections of longitudinal beams and horizontal beams.
4. Install the substrate on beams as per requirements, and the substrate should be fixed and leveled with neat seam.
5. Dispense dedicated structural adhesive on the back of A grade fire-proof board. The position of structural adhesive is just required to meet paste requirements. Then position the A grade fire-proof board through double-faced adhesive tape and stick the A grade fire
-proof board on the substrate. The seam can be processed in conventional ways.
6. After the structural adhesive solidfies, clear away the protecting film on the A grade fire-proof board and clean up the surface